COUNTY HIGHWAY over COUNTY DRAIN
2 WEST 3 SOUTH FAIRMOUNT · County 077, North Dakota · Built 1924 · 2 Lanes · 20 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 2 | Critical |
Location
46.014897, -96.638356
This bridge is in worse condition than 99% of bridges in County 077. The average bridge in North Dakota is 0 years old; this one is 102 years old.
Nearby Bridges
COUNTY HIGHWAY over COUNTY DRAIN
Built 1938
ND HIGHWAY 127 over COUNTY DRAIN 3
Built 2023
COUNTY HIGHWAY over COUNTY DRAIN NO. 3
Built 1938
COUNTY HIGHWAY over COUNTY DRAIN 39
Built 1972
COUNTY HIGHWAY over COUNTY DRAIN 39
Built 1954
COUNTY HIGHWAY over COUNTY DRAIN 39
Built 1972
COUNTY HIGHWAY over DRAINAGE DITCH
Built 1928
100TH ST SE over COUNTY DRAIN NO. 35
Built 2015
ND HIGHWAY 127 over DRAINAGE DITCH
Built 2011
97TH ST SE over DRAINAGE DITCH
Built 2013
Bridge Details
- Structure #
- 000000039131430
- Year Built
- 1924
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.1 m
- Width
- 6 m (19.7 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $140,000
- Total Project Cost
- $210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.