COUNTY HIGHWAY over SOURIS RIVER
4 NORTH 2 EAST TOLLEY · County 075, North Dakota · Built 1977 · 2 Lanes · 150 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.792872, -101.795411
This bridge is in worse condition than 54.2% of bridges in County 075. The average bridge in North Dakota is 0 years old; this one is 49 years old.
Bridge Details
- Structure #
- 000000038111140
- Year Built
- 1977
- Length
- 45.4 m (149 ft)
- Max Span
- 14.3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.