58th Ave SW over KNIFE RIVER

1 MILE EAST OF BEULAH · County 057, North Dakota · Built 1982 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000029122210
Year Built
1982
Length
56.1 m (184.1 ft)
Max Span
21 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.