COUNTY HIGHWAY over SHEYENNE RIVER

3 E 5 S OF COOPERSTOWN · County 039, North Dakota · Built 1970 · 2 Lanes · 23 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000020122210
Year Built
1970
Reconstructed
1998
Length
31.1 m (102 ft)
Max Span
15.2 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
23
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$165,000
Total Project Cost
$248,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.