29TH AVE NE over DRAIN DITCH #12

7 EAST 1 NORTH GILBY · County 035, North Dakota · Built 1969 · 2 Lanes · 10 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000018127070
Year Built
1969
Length
11 m (36.1 ft)
Max Span
10.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$24,000
Total Project Cost
$36,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.