COUNTY HIGHWAY over PEMBINA RIVER
5 EAST OF VANG · County 019, North Dakota · Built 1919 · 2 Lanes · 20 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
48.900444, -98.018231
This bridge is in worse condition than 55.4% of bridges in County 019. The average bridge in North Dakota is 0 years old; this one is 107 years old.
Nearby Bridges
COUNTY HIGHWAY over PEMBINA RIVER
Built 1919
COUNTY HIGHWAY over PEMBINA RIVER
Built 1996
COUNTY HIGHWAY over LITTLE PEMBINA RIVER
Built 1983
COUNTY HIGHWAY over LITTLE NO. PEMBINA RIVER
Built 1986
ND HIGHWAY 32 over PEMBINA RIVER
Built 1989
COUNTY HIGHWAY over PEMBINA RIVER
Built 1977
COUNTY HIGHWAY over DRAIN DITCH
Built 1979
COUNTY HIGHWAY over PEMBINA RIVER
Built 1917
COUNTY HIGHWAY over DRAIN DITCH
Built 1948
COUNTY HIGHWAY over LITTLE NO. PEMBINA RIVER
Built 1991
Bridge Details
- Structure #
- 000000010145081
- Year Built
- 1919
- Reconstructed
- 2017
- Length
- 40.2 m (131.9 ft)
- Max Span
- 30.2 m
- Width
- 5.4 m (17.7 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $327,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.