FB6 over PUPPY CREEK

PU 702 819 · County 093, North Carolina · Built 1970 · 1 Lanes · 2 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
DAPFORBRA000108
Year Built
1970
Length
6.1 m (20 ft)
Max Span
1.5 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
2
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.