NC54 over DIRT

0.6 MI W JCT I-440 · County 183, North Carolina · Built 2023 · 3 Lanes · 11,000 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 8 Very Good
Substructure 9 Excellent

Location

35.7945, -78.712389

This bridge is in worse condition than 31% of bridges in County 183. The average bridge in North Carolina is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000001831632
Year Built
2023
Length
32.9 m (107.9 ft)
Max Span
31.6 m
Width
26.3 m (86.3 ft)
Lanes
3
Daily Traffic
11,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.