APEX PEAKWAY over CSX RAILROAD

0.2 MI. W. JCT. SR1306 · County 183, North Carolina · Built 2010 · 2 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001831344
Year Built
2010
Length
62.1 m (203.7 ft)
Max Span
28 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
12,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.