NC 200 over DRY FORK

0.12 MI. S. JCT. SR1162 · County 179, North Carolina · Built 2022 · 3 Lanes · 14,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000001790602
Year Built
2022
Length
13.4 m (44 ft)
Max Span
3.6 m
Lanes
3
Daily Traffic
14,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.