I-85 SBL RAMP over COLD WATER CREEK

0.05 M. S. JCT. I-85 · County 159, North Carolina · Built 2017 · 1 Lanes · 6,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000001590470
Year Built
2017
Length
25.9 m (85 ft)
Max Span
3.6 m
Lanes
1
Daily Traffic
6,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.