I95 over TENMILE SWAMP CREEK

0.5 MI. N OF JCT. NC 301 · County 155, North Carolina · Built 2017 · 4 Lanes · 52,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000001550511
Year Built
2017
Length
10.9 m (35.8 ft)
Max Span
3.3 m
Lanes
4
Daily Traffic
52,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.