SR1543 over SKYUKA CREEK

.05 MI.E.JCT.NC108 · County 149, North Carolina · Built 2022 · 2 Lanes · 450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001490063
Year Built
2022
Length
21.9 m (71.9 ft)
Max Span
20.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
450
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.