I485 WBL RAMP over I85 NBL RAMP

0.2 MI. S. JCT. I85 · County 119, North Carolina · Built 2014 · 2 Lanes · 17,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000001191226
Year Built
2014
Length
74.3 m (243.8 ft)
Max Span
41.7 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
17,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.