I40E over SWIFT CREEK
0.6 MI S JCT I40 US70 · County 101, North Carolina · Built 2021 · 2 Lanes · 27,250 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
35.622014, -78.566967
This bridge is in worse condition than 36.3% of bridges in County 101. The average bridge in North Carolina is 0 years old; this one is 5 years old.
Nearby Bridges
I40W over SWIFT CREEK
Built 2020
NC540E.COLL over I40
Built 2024
NC540 RAMP over I40S.RAMP
Built 2024
US70E.RAMP over I-40
Built 2023
I40EB RAMP US70 over I40
Built 2024
NC540N.TOLLRAMP over US70E
Built 2024
NC540 RAMP over UT TO SWIFT CREEK
Built 2024
NC540N.TOLL over I40E.RAMP US70W.RAMP
Built 2024
NC540W.TOLL over I40
Built 2024
NC42W over I-40
Built 2023
Bridge Details
- Structure #
- 000000001010503
- Year Built
- 2021
- Length
- 68.2 m (223.8 ft)
- Max Span
- 45.7 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 2
- Daily Traffic
- 27,250
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.