I-40 over SR1338

1.8 MI.W.JCT.US276 · County 087, North Carolina · Built 2023 · 2 Lanes · 12,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

35.625339, -83.008631

This bridge is in worse condition than 24% of bridges in County 087. The average bridge in North Carolina is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000870159
Year Built
2023
Length
26.5 m (86.9 ft)
Max Span
24.6 m
Width
25.5 m (83.7 ft)
Lanes
2
Daily Traffic
12,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.