E. CONE BOULEVARD over US29

0.4 MI.E.JCT.SUMMIT AVE. · County 081, North Carolina · Built 1976 · 6 Lanes · 24,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000810350
Year Built
1976
Length
71.3 m (233.9 ft)
Max Span
26.2 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
24,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.