US 52 over FUTURE I-74

0.67.MI.N.JCT. ZIGLAR ROA · County 067, North Carolina · Built 2023 · 3 Lanes · 22,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

36.201331, -80.297469

This bridge is in worse condition than 28.1% of bridges in County 067. The average bridge in North Carolina is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000670740
Year Built
2023
Length
27.4 m (89.9 ft)
Max Span
25.2 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
22,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.