US52 & NC8 over NORTHWEST BLVD.

.46 MI. N. JCT. US311 · County 067, North Carolina · Built 1963 · 4 Lanes · 81,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000670237
Year Built
1963
Reconstructed
1999
Length
50.9 m (167 ft)
Max Span
23.4 m
Width
27.2 m (89.2 ft)
Lanes
4
Daily Traffic
81,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.