US74 SHELBY BYPAS over NC 180 AND RAILROAD

.3 MILE WEST OF NC 150 · County 045, North Carolina · Built 2023 · 2 Lanes · 21,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000450472
Year Built
2023
Length
170 m (557.7 ft)
Max Span
55.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
21,010
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.