SR1335 over THE STRAIGHTS

0.5 MI.S.JCT.SR1333 · County 031, North Carolina · Built 2023 · 2 Lanes · 3,300 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
000000000310119
Year Built
2023
Length
975.3 m (3199.8 ft)
Max Span
49.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.