I-26 over (FUTURE) BILTMORE FARMS

0.5 MI. S. JCT. B.R. PARK · County 021, North Carolina · Built 2022 · 8 Lanes · 72,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
000000000210937
Year Built
2022
Length
34.7 m (113.8 ft)
Max Span
33.5 m
Width
45.4 m (149 ft)
Lanes
8
Daily Traffic
72,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.