US221 over GAP CREEK

1.9MI.N.JCT.SR1169 · County 009, North Carolina · Built 2021 · 2 Lanes · 3,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000090538
Year Built
2021
Length
39.6 m (129.9 ft)
Max Span
13.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
3,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.