IRR BIA RTE 1410 over RAVEN FORK

12.2 KM NE OF CHEROKEE NC · County 173, North Carolina · Built 1963 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000000S252
Year Built
1963
Reconstructed
1985
Length
26.8 m (87.9 ft)
Max Span
13.6 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
3,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.