LEE ROAD over CROWS NEST BROOK

0.1 MI E OF WASHINGTON RD · County 071, New York · Built 1970 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
DAPUSMWPT000006
Year Built
1970
Length
7.4 m (24.3 ft)
Max Span
6.1 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$76,000
Total Project Cost
$76,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.