UNNAMED TRAIL over BLACK CREEK

190 FT S OF REEDVILLE RD · County 045, New York · Built 2009 · 1 Lanes · 5 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
DAPFORDRU000040
Year Built
2009
Length
8.5 m (27.9 ft)
Max Span
7.3 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
5
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.