BATTLEFIELD ROAD over CSX TRANS/ RIVER LINE

.8 MILE N OF STONY POINT · County 087, New York · Built 1985 · 1 Lanes

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000007346320
Year Built
1985
Reconstructed
2018
Length
19.2 m (63 ft)
Max Span
18.8 m
Width
4 m (13.1 ft)
Lanes
1
Material
Steel
Design
Girder and Floorbeam System
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$333,000
Total Project Cost
$528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.