RTE 87 over Fischer Drive Maintenanc

MC Bridge East Approach · County 119, New York · Built 2017 · 4 Lanes · 143,122 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005525070
Year Built
2017
Length
8.8 m (28.9 ft)
Max Span
8.2 m
Width
58.2 m (190.9 ft)
Lanes
4
Daily Traffic
143,122
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$4,135,000
Total Project Cost
$6,556,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.