AIRPORT DEPARTURES over Taxi Lane AIRPORT ARRIV

buffalo Niagara Internati · County 029, New York · Built 1997 · 2 Lanes

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005524930
Year Built
1997
Length
224.1 m (735.2 ft)
Max Span
11.9 m
Width
22.1 m (72.5 ft)
Lanes
2
Material
Concrete Continuous
Design
Girder and Floorbeam System
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$20,305,000
Total Project Cost
$32,195,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.