N.ACCESS AT 145TH over 907V907VX4M11106 907V90

2 M SOUTH OF G W BRIDGE · County 061, New York · Built 1989 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000005523550
Year Built
1989
Length
144.2 m (473.1 ft)
Max Span
52.4 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
$10,408,000
Total Project Cost
$16,503,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.