WARTBURG CONNECTIO over 907W907W87011023 RTE 90

1.2 MI S JCT HRP & CCP · County 119, New York · Built 1949 · 2 Lanes

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000005521609
Year Built
1949
Reconstructed
2001
Length
31.4 m (103 ft)
Max Span
28.9 m
Width
27 m (88.6 ft)
Lanes
2
Material
Steel
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,116,000
Total Project Cost
$9,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.