RTE I295 over Cross Island Parkway Cr

295I OVER EAST RIVER · County 081, New York · Built 1961 · 6 Lanes · 92,348 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005521269
Year Built
1961
Reconstructed
2011
Length
3429 m (11250 ft)
Max Span
548.6 m
Width
26.4 m (86.6 ft)
Lanes
6
Daily Traffic
92,348
Material
Steel
Design
Suspension
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$500,000,000
Total Project Cost
$792,800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.