RFK Bridge to Harl over From 2nd Ave to HRD NB

Manhattan · County 061, New York · Built 2020 · 1 Lanes

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00000000552120K
Year Built
2020
Length
470.9 m (1544.9 ft)
Max Span
45.4 m
Width
7.4 m (24.3 ft)
Lanes
1
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$17,261,000
Total Project Cost
$27,369,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.