NEW SCOTLAND AVE over 87IX RTE I87
2.39MI NW INT23 ON I87 · County 001, New York · Built 1954 · 2 Lanes · 8,136 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.653753, -73.819117
This bridge is in worse condition than 62.5% of bridges in County 001. The average bridge in New York is 0 years old; this one is 72 years old.
Nearby Bridges
RTE 85 over 87I RTE I87
Built 1964
RTE I87 over KRUMKILL RD
Built 1952
KRUMKILL ROAD over 85 85 11012002 RTE 85
Built 2000
RTE 85 over BERKSHIRE BLVD
Built 2008
RUSSELL ROAD over 87IX RTE I87
Built 1954
RTE 20 over 85 85 11012010 RTE 85
Built 1960
RTE 910E over NORMANS KILL
Built 2005
RTE I87 over CITY WATER TUNNEL
Built 1954
RTE 85 over NORMANS KILL
Built 2001
CAMPUS ACCESS RD over 85 85 11012012 RTE 85
Built 2000
Bridge Details
- Structure #
- 000000005513580
- Year Built
- 1954
- Length
- 75.9 m (249 ft)
- Max Span
- 19.8 m
- Width
- 21.1 m (69.2 ft)
- Lanes
- 2
- Daily Traffic
- 8,136
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $4,198,000
- Total Project Cost
- $6,657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.