STURGEON POINT RD over RTE I90
1.1 MI NE EXIT 57A OF I90 · County 029, New York · Built 1957 · 2 Lanes · 752 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.673889, -78.947842
This bridge is in worse condition than 68.2% of bridges in County 029. The average bridge in New York is 0 years old; this one is 69 years old.
Nearby Bridges
STURGEON POINT RD over RTE I90
Built 1957
90IX EXIT 57A RAMP over 90IX RTE I90
Built 1971
RTE I90 over EIGHTEEN MILE CREEK SHA
Built 1957
RTE I90 over EIGHTEEN MILE CREEK SHA
Built 1957
OVERHEAD BRIDGE RD over CSX/AMTRAK (&NSRR) NORF
Built 1992
RTE 20 over EIGHTEENMILE CRK
Built 1929
EDEN EVANS CENTER over 90IX RTE I90
Built 1956
NORTH CREEK ROAD over 90IX RTE I90
Built 1956
RTE 5 over EIGHTEEN MILE CR
Built 1931
NEW JERUSALEM RD. over RYTHUS CREEK
Built 1972
Bridge Details
- Structure #
- 000000005512390
- Year Built
- 1957
- Length
- 51 m (167.3 ft)
- Max Span
- 21.3 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 752
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $2,533,000
- Total Project Cost
- $4,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.