STURGEON POINT RD over RTE I90

1.1 MI NE EXIT 57A OF I90 · County 029, New York · Built 1957 · 2 Lanes · 752 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000005512390
Year Built
1957
Length
51 m (167.3 ft)
Max Span
21.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
752
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$2,533,000
Total Project Cost
$4,017,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.