RTE I190 over SMITH ST

2.4 MI WNW JCT RTSI190<16 · County 029, New York · Built 1959 · 8 Lanes · 75,744 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005512249
Year Built
1959
Reconstructed
1992
Length
50.4 m (165.4 ft)
Max Span
25.3 m
Width
34.1 m (111.9 ft)
Lanes
8
Daily Traffic
75,744
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$7,292,000
Total Project Cost
$11,563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.