RTE I90 over AUBURN TRAIL

1.5 MI W OF EXIT 45 90I · County 069, New York · Built 1950 · 4 Lanes · 32,263 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000005510790
Year Built
1950
Reconstructed
2011
Length
12.5 m (41 ft)
Max Span
11.3 m
Width
34.5 m (113.2 ft)
Lanes
4
Daily Traffic
32,263
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$3,683,000
Total Project Cost
$5,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.