EXIT 35 RAMP over 90IX 90IX

RAMP BRIDGE EXIT 35 I90 · County 067, New York · Built 2023 · 2 Lanes · 3,798 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000005510090
Year Built
2023
Length
52.9 m (173.6 ft)
Max Span
28 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
3,798
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$2,113,000
Total Project Cost
$3,350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.