RTE 987D over SAW MILL RIVER
0.1 MI N JCT RTS SMRP<I87 · County 119, New York · Built 2019 · 4 Lanes · 29,010 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.043908, -73.835017
This bridge is in worse condition than 15.6% of bridges in County 119. The average bridge in New York is 0 years old; this one is 7 years old.
Nearby Bridges
RTE 987D over RTE I87 SAW MILL RVR PK
Built 1953
RTE I87 over RTE 987 SAW MILL RIVER
Built 1953
RTE 987D over SAW MILL RIVER
Built 2019
TAXTER ROAD over 87IX RTE I87 I287 RAMP
Built 1953
RAMPV I287 TO I87 over 87IX 87IX RAMP W I87 T
Built 2004
RTE I87 over RTE I287 RAMP V TO I87
Built 2004
RAMP X I87 N TO I2 over RAMP W I87 TO 119
Built 2003
87IXINT 8 RAMP V over 287IX 287IX
Built 2003
RTE I87 over 287IX
Built 2004
RTE 987 over 119 87011023
Built 2024
Bridge Details
- Structure #
- 000000005500719
- Year Built
- 2019
- Length
- 58.5 m (191.9 ft)
- Max Span
- 22.9 m
- Width
- 21.4 m (70.2 ft)
- Lanes
- 4
- Daily Traffic
- 29,010
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,660,000
- Total Project Cost
- $10,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.