RTE I87 over US Route 202 RTE 202 W

JCT OF I87 & S H 202 · County 087, New York · Built 1953 · 7 Lanes · 81,424 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005040109
Year Built
1953
Length
110 m (360.9 ft)
Max Span
37.5 m
Width
34.4 m (112.9 ft)
Lanes
7
Daily Traffic
81,424
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$28,872,000
Total Project Cost
$45,780,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.