RTE I87 over RTE 17 RAMAPO RIVER Me

JCT I87 AND SH 17 · County 087, New York · Built 1953 · 4 Lanes · 36,690 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005014082
Year Built
1953
Length
243.5 m (798.9 ft)
Max Span
37.8 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
36,690
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$22,760,000
Total Project Cost
$36,088,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.