NORTH ADAM STREET over ERIE CANAL

AT LOCKPORT ON CANAL · County 063, New York · Built 1918 · 2 Lanes

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Critical
Deck
4
Poor
Superstructure
1
Imminent Failure
Substructure
2
Critical

Bridge Details

Structure #
000000004454140
Year Built
1918
Length
39.6 m (129.9 ft)
Max Span
29.5 m
Width
7.8 m (25.6 ft)
Lanes
2
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,676,000
Total Project Cost
$8,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.