DRY DOCK ROAD over ERIE CANAL
1.3 MI W JCT RTE 414 · County 117, New York · Built 1919 · 2 Lanes · 339 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
2
Critical
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 2 | Critical |
| Substructure | 4 | Poor |
Location
43.062108, -77.019064
This bridge is in worse condition than 98% of bridges in County 117. The average bridge in New York is 0 years old; this one is 107 years old.
Nearby Bridges
31 3706 1079 over RTE 31
Built 2013
WATER STREET over GANARGUA CREEK
Built 2011
RTE 31 over CANANDAIGUA OUTLT
Built 1936
LEACH STREET over Erie Canal Lock 27 and T
Built 1919
RTE 31 over CSX TRANS/AMTRAK
Built 1984
COUNTY HOUSE RD over ERIE CANAL
Built 1914
RTE 14 over DEPEW AVENUE CSX TRANS/
Built 1976
RTE 14 over ERIE CANAL
Built 1991
RTE 31 over ERIE CANAL
Built 1965
COLE ROAD over CSX TRANS/AMTRAK
Built 1993
Bridge Details
- Structure #
- 000000004437080
- Year Built
- 1919
- Length
- 45.4 m (149 ft)
- Max Span
- 26.5 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 339
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,147,000
- Total Project Cost
- $1,818,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.