ROADWAY over LOCK O2

Lock 02 - Fulton NY · County 075, New York · Built 1919 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000004434090
Year Built
1919
Length
31.1 m (102 ft)
Max Span
21.3 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Movable - Swing
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,442,000
Total Project Cost
$5,457,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.