ACCESS RD TO LOCK over CANAL LOCK E3 SPILLWAY

LOCK 3E ACCESS & ERIE C · County 091, New York · Built 1906 · 1 Lanes · 250 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000004415140
Year Built
1906
Length
38.1 m (125 ft)
Max Span
9.4 m
Width
3.7 m (12.1 ft)
Lanes
1
Daily Traffic
250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$483,000
Total Project Cost
$766,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.