ACCESS TO LOCK 2 over CHAMPLAIN CANAL

JCT LOCK #2 & CHAMPLAIN C · County 091, New York · Built 1994 · 1 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000004415030
Year Built
1994
Length
115.5 m (378.9 ft)
Max Span
31 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
30
Material
Steel
Design
Truss - Thru
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$5,092,000
Total Project Cost
$8,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.