RTE 4 over GLENS FALLS FEEDER CANAL

0.5 MI. N. RTE. 196 INTER · County 115, New York · Built 2017 · 3 Lanes · 10,279 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000004001080
Year Built
2017
Length
17.4 m (57.1 ft)
Max Span
16.8 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
10,279
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$990,000
Total Project Cost
$1,570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.