CROWFOOT POND LAN over MILL BROOK

AT INTERSECTION WITH CR 4 · County 031, New York · Built 2007 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000003370370
Year Built
2007
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
35
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000
Total Project Cost
$305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.