SOUTH OXFORD BRDGE over CHENANGO RIVER

3.1 MI SO OF OXFORD · County 017, New York · Built 1980 · 2 Lanes · 317 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000003350600
Year Built
1980
Length
42.1 m (138.1 ft)
Max Span
41.7 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
317
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$956,000
Total Project Cost
$1,517,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.