CR133 over HALFWAY BROOK

7.0 MI.SE WHITNEY POINT · County 007, New York · Built 1953 · 2 Lanes · 156 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000003349120
Year Built
1953
Reconstructed
2015
Length
22.9 m (75.1 ft)
Max Span
20.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
156
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$958,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.